Tough task: TNB maintenance personnel in action in Rawang. The firm spends RM40mil every year to remove sediment such as sand and rubbish to keep its Cameron Highlands hydro dam capacity running at optimum level.皇冠APP下载(www.hg108.vip)是一个开放皇冠即时比分、皇冠官网注册的平台。皇冠注册平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。
Tenaga Nasional Bhd (TNB) continues to contend with unforeseen expenditure in running hydroelectric (hydro) dams in the country, as an increasing level of water pollution has become a growing issue.
Despite this, the group’s power generation unit, TNB Power Generation Sdn Bhd (TNB Genco), acknowledges that hydro dams are considered an important source of renewable energy.
,,免费足球贴士网(www.hgbbs.vip)是国内最权威的足球赛事报道、预测平台。免费提供赛事直播,免费足球贴士,免费足球推介,免费专家贴士,免费足球推荐,最专业的足球心水网。
- 发表评论
-
- 最新评论 进入详细评论页>>